by Daniel Park | Apr 30, 2020 | Design, Emergency Lighting, Fire, Fire Engineering, Passive Fire Design
Overview The building has a footprint of 1,570m² with a large grocery shopping area, five internal sub-tenancy units, and a warehouse area. Our design aimed to provide a simple architectural form with modern, elegant aesthetics for a high-level shopping environment....
by Daniel Park | Apr 29, 2020 | Emergency Lighting, Fire, Fire Engineering, Passive Fire Design
Overview The building is a 5 level structure, including the basement car parking floor. It was previously used as 2 Degrees headquarter, and then later purchased by our client in conjunction with NMIT to fully refurbish and modernise the entire building for a tertiary...
by Daniel Park | Apr 28, 2020 | Design, Emergency Lighting, Fire, Fire Engineering, Passive Fire Design
Overview The building has a footprint of 1,400m² with four large commercial tenancies, including a restaurant at the front of the site. It is mainly constructed of precast panels and floors with steel roofing and feature cladding. The challenge was to create a modern...
by Daniel Park | Apr 20, 2020 | Design, Emergency Lighting, Fire, Fire Engineering, Passive Fire Design
Overview The site as presented was a gentle flat ground with two separate titles of land which united to form the industrial building. The industrial building itself had a 2,170m² floor area that accommodated showroom, office, storage and manufacturing factory for...