by Daniel Park | Apr 23, 2020 | Design, Fire, Fire Engineering
THE DESIGNFIRE provided a fire engineering report for the building.
by Daniel Park | Apr 23, 2020 | Design, Fire, Fire Engineering, Passive Fire Design
Overview We were commissioned by our client to develop a multi unit housing development across 3 existing sites on the highly desirable Sunnynook Road. We came up with a design of 3 separate blocks of multi-unit houses of varying densities from stand-alone houses to...
by Daniel Park | Apr 23, 2020 | Design, Fire, Fire Engineering
THE DESIGNFIRE provided fire engineering design.
by Daniel Park | Apr 22, 2020 | Design, Fire, Fire Engineering, Passive Fire Design
It is a very challenging steep site, with big ONF (Outstanding Nature Feature) area in the back which can’t be touched at all. The client wanted to maximize the floor area, so the design had to be very carefully thought about and fit into the existing environment...
Recent Comments